Back to NOVARC ENERGY中文

Information & Disclosures

Content basis: company brochure and service scope confirmed on September 18, 2026

01 / Business Scope and Delivery Responsibilities

This website presents our business areas: Independent Storage, Integrated Energy, AI Energy Trading and Intelligent Maintenance. Intelligent Maintenance includes centralized monitoring and alerts, AI diagnostics and asset health, inspection and work order closure, and on-site maintenance. This does not imply that all functions are developed in-house or that all on-site services are provided by our own employees.

Service scope, project eligibility, delivery responsibilities and response arrangements are governed by the project contract agreed by both parties. This website makes no promises of diagnostic accuracy, zero failures, fixed returns or future earnings.

02 / Scale, Cases and Collaboration

  • 300MWh+: operating scale across the Beichenxing ecosystem.
  • 15GWh+: independent storage pipeline resources, not completed or operational capacity.
  • 10 billion kWh+: the volume covered by parallel live-market testing and validation of AI strategies, not NOVARC ENERGY's own electricity sales or a financial trading volume.
  • Hunan Zhuye, SAIC Volkswagen, ZPC Zhoushan and Fuyao Glass are ecosystem delivery cases included in company materials. They do not mean that NOVARC ENERGY independently built, or wholly owns and operates, these projects.
  • The four-party relationship between industry, technology, operations and capital describes business collaboration. It does not indicate equity percentages, legal affiliation or funding commitments.

Figures come from company operating statistics and project materials and may change as the business develops. Historical operating results do not guarantee future returns. Actual results depend on market rules, asset conditions and operating circumstances.

03 / Visual Materials

Images of campuses, equipment, virtual power plants and trading architecture are brand visuals and generative illustrations. They do not represent actual company offices, completed campuses, specific product models or formal engineering drawings. The Hunan Zhuye case uses a newly supplied project-site photograph, with only cropping, resizing and format conversion for display; it has not been redrawn using AI. The photograph is not used to infer when it was taken or whether the project was in operation. Images for SAIC Volkswagen, ZPC Zhoushan and Fuyao Glass are AI-enhanced visuals based on company site materials, not unprocessed original site photographs. Generated details are not treated as new engineering facts.

The energy operations platform image is a locally composed conceptual interface, not a real software screenshot or live operating data. It does not demonstrate that all illustrated functions are live. Animated connections and architecture diagrams express coordination and are not connected to actual power plants or trading systems. The brand mark uses a deterministic white conversion of the original logo.

04 / Project Checklist and Privacy

The discussion checklist form only generates a text file in your browser and downloads it locally. It does not send your entries to NOVARC ENERGY or confirm an appointment or submission. Please share the checklist yourself with the sales representative you are already in contact with. Do not enter sensitive information such as identity documents or account passwords.

This version does not integrate analytics tracking, advertising cookies, online customer support or a customer information database. Copying the address requires browser clipboard permission. If copying fails, you can select the address and copy it manually.

05 / Company Information

NOVARC ENERGY
Legal name in Chinese: 杭州北辰星云数智能源科技有限公司
D12-504, Alibaba Center, Sikai Road, Future Sci-Tech City, Hangzhou, China
Company domain: www.novarcen.com

Download the eight-page company brochure (Chinese PDF)